« Previous
Next »
Titles
- Project no. 3 -- Toxic gases in armored vehicles. Final report on sub-project no. 3-2 -- Determination of the characteristics and effects upon the crew of gun fumes from firing of the weapons in tanks of the M5 series1
- Project no. 3 -- Toxic gases in armored vehicles. First partial report on sub-project no. 3-4 -- Determination of basic ventilation characteristics of tanks of the M4 series : sub-project no. 3-6 -- Determination of basic ventilation characteristics of tanks of the M5 series1
- Project no. 3 -- Toxic gases in armored vehicles. Partial report on sub-project no. 3-9 -- Determination of the ventilation requirements for gas-proofing tanks : ventilation requirements for gas-proofing the M-5 tank1
- Project no. 3 -- Toxic gases in armored vehicles. Partial report on sub-project no. 3-9, Determination of the ventilation requirements for gas-proofing tanks : subject: ventilation requirements for gas-proofing tanks of the M-4 series1
- Project no. 3 -- Toxic gases in armored vehicles. Second partial report on sub-project no. 3-9 -- Determination of ventilation requirements for gas-proofing tanks of the M4 series1
- Project no. 3 -- Toxic gases in armored vehicles. Supplement report on sub-project 3-1 -- Determination of the characteristics and effects upon the crew of gun fumes from firing of the weapons in tanks of the M4 series : sub-project 3-5 -- Correlation of basic ventilation data with gun fume studies and devalopment for the control of gun fumes in the M4 tanks : subject -- Control of gun fumes in M4 series medium tanks by positive-pressure ventilation1
- Project no. 3 -- Toxic gases in armored vehicles. Supplemental report on sub-project no. 3-12 -- The carbon monoxide hazard from auxiliary generators in tanks1
- Project no. 4 -- Dust exposure in armored vehicles. Final report on sub-project no. 4-1 -- Determination of dust-loads and characteristics of dusts encountered in operation of armored vehicles1
- Project no. 5 -- Crew fatigue research. Project no. 5-8 Estimation of the practical significance of tank noise : subject: effect of exposure to tank noise upon hearing acuity of tank crews1
- Project no. 5 -- Crew fatigue research. Report on sub-project no. 5-1, Adequate head room in tanks1
- Project no. 7 -- Night vision from tanks. First partial report on sub-project no. 7-1, Determination of the lighting requirements for various tasks of tank crews1
- Project no. 7 -- Night vision from tanks. Report on sub-project no. 7-2, Determination of intensity, distribution and type of illumination in tanks least disturbing to dark adaptation. Sub-project no. 7-3, Investigation of methods of improving night vision in tank crews by the use of eye appliances1
- Project no. 7 -- Night vision from tanks. Report on sub-project no. 7-5, Establishment of criteria and methods for the selection of crews for night operations. Subject, a program for the improvement of the night-seeing-ability of ground troops1
- Project no. 7 -- Night vision from tanks. Report on sub-project no. 7-8, Comparison and evaluation of field and laboratory methods of measuring night visual acuity1
- Project no. T-13 -- survey of foot measurements and the proper fit of army shoes. First partial report on study of factors bearing on the establishment of size tariffs, on size designations, and on shoe fitting1
- Putting it up to the boys1