« Previous
Next »
Titles
- Final report on Project no. 41 -- physiological and operational characteristics of tank T25E11
- Final report on Project no. 44 -- physiological and operational characteristics of M-24 tank1
- Final report on Project no. 45 -- operational and physiological characteristics of the tank T26E3, (M26): subject: the study of the proposed relocation of the 1000 CFM tank ventilating blower to the turret bulge1
- Final report on Project: AMRL no. 37 -- study of errors in field artillery practice1
- First partial report on Project no. 45 -- physiological and operational characteristics of T26E3 tank1
- First partial report on Project, AMRL no. 37 and NDRC no. SOS-11 -- study of errors in field artillery practice1
- First partial report on project no. 41 -- physiological characteristics of the T25E1-T26E1 tank: subject: control of gun fume hazard1
- Fourth partial report on Project no. 37 -- study of errors in field artillery practice: subject: an analysis of the sources of error in the use of the aiming circle and development of an improved instrument1
- Second partial report on Project no. 37 -- study of errors in field artillery practice: subject: an analysis of the sources of error in the use of the panoramic telescope M12 and development of principles of design for an improved instrument1
- Second partial report on Project no. 45 -- operation and physiological characteristics of the tank T26E3: subject: the physiological work rates of the driver and loader in the tank T26E3 in relation to fatigue and efficiency of performances1
- Third partial report on Project no. 37 -- study of errors in field artillery practice: subject: analysis of requirements for eliminating errors in laying guns in elevation1