« Previous
Next »
Titles
- Final report on project no. 10 -- test of truck, 3/4 ton, improved insulated ambulance1
- Project no. 2 -- High temperatures in tanks. Final report on sub-project no. 2-29 -- Test of truck, 3/4 ton, refrigerated ambulance1
- Project no. 2 -- Operations at high temperatures. First partial report on sub-project no. 2-22, Determination of the amount of heat transmitted to the fighting compartment of tanks under field conditions1
- Project no. 2 -- Operations at high temperatures. First partial report on sub-project no. 2-24, Study of methods of reducing the heat load in tanks1
- Project no. 3 -- Toxic gases in armored vehicles. Final report on sub-project no. 3-2 -- Determination of the characteristics and effects upon the crew of gun fumes from firing of the weapons in tanks of the M5 series1
- Project no. 3 -- Toxic gases in armored vehicles. First partial report on sub-project no. 3-4 -- Determination of basic ventilation characteristics of tanks of the M4 series : sub-project no. 3-6 -- Determination of basic ventilation characteristics of tanks of the M5 series1
- Project no. 3 -- Toxic gases in armored vehicles. Partial report on sub-project no. 3-9, Determination of the ventilation requirements for gas-proofing tanks : subject: ventilation requirements for gas-proofing tanks of the M-4 series1
- Project no. 3 -- Toxic gases in armored vehicles. Second partial report on sub-project no. 3-9 -- Determination of ventilation requirements for gas-proofing tanks of the M4 series1
- Project no. 3 -- Toxic gases in armored vehicles. Supplement report on sub-project 3-1 -- Determination of the characteristics and effects upon the crew of gun fumes from firing of the weapons in tanks of the M4 series : sub-project 3-5 -- Correlation of basic ventilation data with gun fume studies and devalopment for the control of gun fumes in the M4 tanks : subject -- Control of gun fumes in M4 series medium tanks by positive-pressure ventilation1
- Project no. 5 -- Crew fatigue research. Project no. 5-8 Estimation of the practical significance of tank noise : subject: effect of exposure to tank noise upon hearing acuity of tank crews1
- Report on control of gun fumes in M-4 series medium tanks1
- Report on gun fume hazard from 37 mm gun in M5 light tank1
- Report on project no. 12 -- test of accousti-guard (ear protective device)1