« Previous
Next »
Titles
- Final report on Project no. 41 -- physiological and operational characteristics of tank T25E11
- Final report on Project no. 44 -- physiological and operational characteristics of M-24 tank1
- Final report on Project no. 45 -- operational and physiological characteristics of the tank T26E3, (M26): subject: the study of the proposed relocation of the 1000 CFM tank ventilating blower to the turret bulge1
- First partial report on Project no. 45 -- physiological and operational characteristics of T26E3 tank1
- First partial report on project no. 41 -- physiological characteristics of the T25E1-T26E1 tank: subject: control of gun fume hazard1
- Report on Project no. 36 -- treatment of mess kits to remove glare1