NLM Digital Collections

Search

Search Constraints

Start Over You searched for: Collections World War 2, 1939-1949 Remove constraint Collections: World War 2, 1939-1949

Search Results

2893. Final report on Project no. 41 -- physiological and operational characteristics of tank T25E1

2896. First partial report on Project no. 45 -- physiological and operational characteristics of T26E3 tank

2897. Second partial report on Project no. 45 -- operation and physiological characteristics of the tank T26E3: subject: the physiological work rates of the driver and loader in the tank T26E3 in relation to fatigue and efficiency of performances

2898. Final report on Project no. 45 -- operational and physiological characteristics of the tank T26E3, (M26): subject: the study of the proposed relocation of the 1000 CFM tank ventilating blower to the turret bulge