NLM Digital Collections

Search

Search Constraints

Start Over You searched for: Collections World War 2, 1939-1949 Remove constraint Collections: World War 2, 1939-1949 Genre Technical Report Remove constraint Genre: Technical Report

Search Results

14. First partial report on Project no. 45 -- physiological and operational characteristics of T26E3 tank

15. Second partial report on Project no. 45 -- operation and physiological characteristics of the tank T26E3: subject: the physiological work rates of the driver and loader in the tank T26E3 in relation to fatigue and efficiency of performances

16. Final report on Project no. 45 -- operational and physiological characteristics of the tank T26E3, (M26): subject: the study of the proposed relocation of the 1000 CFM tank ventilating blower to the turret bulge